CorporationInstallation InstructionsPower ColumnsRegal Series
NotePower column installation should conform to local building codesThe installation instructions provided is for the Amico standard products. Slight
Before InstallationReview a copy of the nal approved shop drawing(s) and/or submittal package. These documents will provide you with technical infor
Installation3 Amico ArchitecturalRemove laminate panels from power column (using tool provided) by lifting panels vertically until resistance is fe
www.amico.com 4Refer to following gures to complete installation.2.“C” channelpower columnFigure 2Figure 1A = 6.750” (171.5mm) for 9” PCA =
5 Amico ArchitecturalAnchor base of column to oor (hardware by others). Note that base does not have to be removed to complete this step. See