Operating & Maintenance ManualAutomatic Medical Gas ManifoldDome Loaded Regulator CSA www.amico.com
OPERATING ALARM SYSTEMSThe manifold control cabinet contains the required circuitry to send a dry contact signal to the alarm unit when a bank is empt
www.amico.com 11Display Functions1. Introduce power to the control cabinet. 2. Follow Cylinder Changing Procedures on the side of the cabin
12 Amico PipelineInstallationPRECAUTIONS• Tampering with gas specic connections shall be prohibited. Do not alter, remove or modify gas specic
www.amico.com 13Wall Mounting Instructions1. Remove manifold control panel from the shipping carton and ensure it’s in an upright position o
14 Amico Pipeline4. Hang the manifold control panel on the mounting bracket. The top two control panel mounting bolts will slide into slots of
www.amico.com 15 Microprocessor Digital ManifoldPage: 4USER RESPONSIBILITYThe information contained in this Installation and Maintenance Manu
16 Amico PipelineCylinder Bank Installation Instructions Microprocessor Digital ManifoldPage: 4USER RESPONSIBILITYThe information contained in thi
www.amico.com 17Testing for LeakageThe following instructions apply for performing a leak test on the joints made during assembly and connect
18 Amico PipelineTesting for LeakagePrecautions The Amico Automatic Gas Manifolds are designed in accordance with the CSA Standard.There are thre
www.amico.com 19Initial Power-UpRelease the two latches on either side of the manifold control panel and remove the cover. Verify the followi
User Responsibility 4Introduction 5 Features Description of the Manifold 6 Shipment Details The Manifold E
20 Amico Pipeline11.12.13.14.15.16.17.18.19.20.21.Verify the following:• Right bank Red “Empty” LED goes out.• Right bank Yellow “Ready” LED ill
www.amico.com 21High pressure gas is provided to the left and right manifold bank inlets via cylinders, pigtails, and header assemblies. Flow
22 Amico PipelineManifold Switch OverAfter electrical power has been applied to the manifold, the side pressurized rst is designated as the prima
www.amico.com 23Performance VericationRemove manifold cover.Before beginning the test, verify following:If the manifold is not in use, close
24 Amico PipelinePerformance Verication 18.19.20.21.22.23.24.25.26.27.28.29.Verify that the line pressure gauge reading is the same as in step 11
www.amico.com 25Bank Regulator Pressure AdjustmentThis procedure should only be performed if the bank regulator pressures are not within acce
26 Amico PipelineShould it be necessary to replace the bank regulator, it can be done while the manifold is in service. However, this should only
www.amico.com 27If necessary, the line regulator replacement can be performed while manifold is in service. However, this should only be done
28 Amico PipelineControl Board Replacement If necessary, the control board replacement can be performed while the manifold is in service. However,
www.amico.com 29Cylinder Changing ProceduresWARNING: High pressure oxygen systems must be handled with CAUTION. Spontaneous combustion may oc
User Responsibility 4Introduction 5 Features Description of the Manifold 6 Shipment Details The Manifold E
30 Amico PipelineOrdering InformationDESCRIPTION MODEL NUMBERPressure transducer for Oxy, N2O, Air, CO2, & NitLine pressure regulator for Heav
www.amico.com 31Control Cabinet Parts ListDESCRIPTION MODEL NUMBERIntermediate check valve for all gasesOperating pressure relief valve Nitro
32 Amico PipelineAppendix AManifold Internal Layout
www.amico.com 33Appendix B5643543612RIGHTBANKLEFTBANKHPLBHPRBRIGHT HAND BANKCYLINDER PRESSURELEFT HAND BANKCYLINDER PRESSUREPIPING SCHEMATIC
34 Amico PipelineAppendix CWiring Schematic Heater UnitsThe Heaters normally switch on when the temperature drops below 24°C or 75°F. If the temp
www.amico.com 35Appendix DElectrical Wiring DiagramAmico Medical Gas AlarmMaster Alarm115 VACSupplyVoltageConnect the NO loop to the appropri
36 Amico PipelineAppendix EControl Cabinet Wiring Diagram
www.amico.com 37Appendix FStaggered Header Bar
38 Amico PipelineStraight Header Bar SetupAppendix G
www.amico.com 39Appendix HOptional Header Bar Setup
4 Amico PipelineUser ResponsibilityThe information contained in this Installation and Maintenance Manual pertains only to the Amico Automatic Gas
40 Amico PipelineStraight Header Bar SetupAppendix I
www.amico.com 41 Notes
Notes42 Amico Pipeline
www.amico.com 43Notes
Amico Pipeline | www.amico.com 85 Fulton Way, Richmond HillOntario, L4B 2N4, CanadaToll Free Tel: 1.877.264.2697Toll Free Fax: 1.866.440.4986Tel: 90
www.amico.com 5IntroductionThe Amico Automatic Gas Manifold is designed to provide a reliable, uninterrupted supply of gas to a hospital or o
6 Amico PipelineDescription of the ManifoldSHIPMENT DETAILSThe Manifold system may be shipped in more than one carton, depending on the number of
www.amico.com 7Description of PartsAn isolation valve ¾ “ with a locking handle supplied with the manifold should be installed on top of the
8 Amico Pipeline DUAL LINE REGULATOROn every Amico Automatic Gas Manifold the line regulator is capable of maintaining a constant dynamic deliver
www.amico.com 9The Control Board is an electronic circuit board that controls the bank switch-over. It monitors the pressure with the help of