Operating & Maintenance ManualGas Control Panel www.amico.com
2 Amico PipelineContentsIntended Use/Introduction 3Operation 4Installation 4Parts List 4 - 5Notes 6 - 7
www.amico.com 3Intended UseIntroductionThe Gas Control Panel consists of a shut-o valve, delivery and supply pressure gauges, pressure regu
4 Amico Pipeline1. Turn the Shut-o valve to the “Open” position.2. Verify that the correct supply pressure is available on the supply gauge.3.
www.amico.com 516Disconnect HereAdjustable Mounting Bracket1514Diagrams9 8 7 654213110131112 Not visibleItem Description Part Number Item D
6 Amico PipelineNotes
www.amico.com 7Notes
Amico Pipeline | www.amico.com 85 Fulton Way, Richmond HillOntario, L4B 2N4, CanadaToll Free Tel: 1.877.462.6426Toll Free Fax: 1.866.440.4986Tel: 90
Commentaires sur ces manuels