CorporationInstallation InstructionsReection Series Artwall
NoteBefore InstallationArtWall installation should conform to local building codesThe installation instructions provided are for the Amico standard pr
Attach art wall back box to wall structure using hardware compliant to applicable building codes. Allow gap between back box ange to stud faces for
Make all medical gas connections from art wall to rough-ins. Medical gas pipes are terminated as per shop drawings. Insert art into frame, then atta
Attach frame and movement assembly to back box using hardware provided at loca-tions shown. Move frame as necessary to reach all of the hardware. Ti
Amico Architectural | www.amico.com 85 Fulton Way, Richmond HillOntario, L4B 2N4, Canada71 East Industry Court, Deer Park NY 11729, U.S.AToll Free Tel
Commentaires sur ces manuels