Installation lnstructionsSecurity ConsolesSelect Series w w w . a m i c o . c o m
Notes10 Amico Pipeline
Notes www.amico.com 11
C US LISTEDAmico Pipeline | www.amico.com85 Fulton Way, Richmond HillOntario, L4B 2N4, Canada71 East Industry Court, Deer Park NY 117
Security console installation should conform to local building codes1. Review a copy of the nal approved shop drawing(s) and/or submittal package.
Installation2. Remove the fascia by loosening the 2 screws (1 on each side) attaching it to the console. Place everything in a safe and clean loca
3. The console should be ush with the nished drywall after installation (see Fig. 1). Check the positioning of the anges to determine if adj
5. Remove any devices that are blocking access to the ange screws. Place everything in a safe and clean location.6. Loosen the 2 ange screw
10. Make all on-site gas and electrical connections, and perform any wiring required. If it is necessary to remove an aluminum device plate to wi
12. Reassemble the fascia removed in step 2.13. Reassemble the electrical and gas cover plates removed in step 1.14. To mount the security door, pl
Finished Product8 Amico Pipeline
Other Installation Notes1. Division 15 to connect gas stubs on console to building medical gas supply lines previously roughed in.2. Division 16 to
Commentaires sur ces manuels